The following table shows the connection fee without CEM work:
Non Residential:
Original subscribed demand |
Required subscribed demand |
||||
---|---|---|---|---|---|
6.9kVA |
11.5kVA |
13.8kVA |
20.7kVA |
34.5kVA |
|
3.4kVA |
MOP 520 |
MOP 1,215 |
MOP 1,560 |
MOP 2,600 |
MOP 4,680 |
6.9kVA |
MOP 695 |
MOP 1,040 |
MOP 2,080 |
MOP 4,160 |
|
11.5kVA |
|
MOP 345 |
MOP 1,385 |
MOP 3,465 |
|
13.8kVA |
|
|
MOP 1,040 |
MOP 3,120 |
|
20.7kVA |
|
|
MOP 2,080 |
Residential:
Original subscribed demand |
Required subscribed demand |
||
---|---|---|---|
13.8kVA |
20.7kVA |
34.5kVA |
|
3.4kVA |
MOP 345 |
MOP 1,385 |
MOP 3,465 |
6.9kVA |
MOP 345 |
MOP 1,385 |
MOP 3,465 |
11.5kVA |
MOP 345 |
MOP 1,385 |
MOP 3,465 |
13.8kVA |
|
MOP 1,040 |
MOP 3,120 |
20.7kVA |
MOP 2,080 |
Remarks:
The above table is for reference only, the actual cost will be subjected to the connection charges notification letter.
Requirement of Cable and Meter Board (Panel):
Subscribed Demand |
Cable size |
Cable Color |
Meter Board / Panel |
---|---|---|---|
3.4kVA |
3x6mm2 |
Brown, Blue and Yellow/Green |
Meter board size (LxW) 300x300mm, 200x400mm Meter box size (LxWxD) 430x380x230mm, 300x540x230mm |
6.9kVA |
|||
11.5kVA |
1x16+N10+T10mm2 |
||
13.8kVA |
5x6mm2 |
Brown, Black, Grey, Blue and Yellow/Green
|
Meter board size (LxW) 350x350mm, 250x500mm
Meter box size (LxWxD) 300x380x230mm, 300x540x230mm
|
20.7kVA |
5x10mm2 |
||
34.5kVA (3x50A) |
3x16+N10+T10mm2 |
Remarks:
(1) The height of the meter: 1.0 - 1.6m from the ground to the display of the meter.
(2) If the requested subscribed demand is higher than 34.5kVA, the metering system will be indirectly connected and CT chamber is required. The requirement of the metering box and CT chamber will refer to CEM standard.
(3) The above requirement of cable and meter board (panel) is provided to electrical contractor's reference only.
Remarks:
(1)The above diagram is a three-phase direct connection.
(2) Customer needs to replace the cables before and after the meter according to the above requirement.
(3) If no network alternation is involved, the validity of the application is 30 days.
* For application with no network alternation involved